Kilimanjaro: Day 4 - Rongai Route (Acclimatisation Day) (Wed 20 Feb 2013)

Walk Information

Walk route: Mawenzi Tarn Camp (4310m) - Mawenzi Tarn Camp (4310m)

Ascent: 675ft

Time: 1 hour 25 minutes

With: KE Adventure / Tanzania Rift Valley Tours

Comment: Just a short walk today, up 200m onto the ridge to help with our acclimatisation.

Route Map

route map
© Crown copyright. All rights reserved. Licence number AL100038401

Photos

[view all photos as thumbnails]

First light on Mawenzi
First light on Mawenzi

Cold last night, -5C inside the tent
Cold last night, -5C inside the tent

Breakfast
Breakfast

Tarn Camp, all the other groups are moving on so ours are the only tents still up
Tarn Camp, all the other groups are moving on so ours are the only tents still up

Heading up on our acclimatisation walk
Heading up on our acclimatisation walk

At over 4000m we are high above the plains
At over 4000m we are high above the plains

We gain the ridge
We gain the ridge

The camp from our high point, 4500m, 200m above the tarn
The camp from our high point, 4500m, 200m above the tarn
It took us 55 minutes to reach here, we sunbathed and enjoyed the view for 45 minutes before descending back to camp in 30 minutes

Looking across to Kibo
Looking across to Kibo

Mawenzi from our high point on the ridge
Mawenzi from our high point on the ridge

Starting to head back down
Starting to head back down

Steeply down off the ridge
Steeply down off the ridge

Descending
Descending

Nearly back at camp
Nearly back at camp

Tarn reflections
Tarn reflections

'Long drop' toilets
'Long drop' toilets

previous walk - Tue 19 Feb 2013 - Kilimanjaro: Day 3 - Rongai Route

next walk - Thu 21 Feb 2013 - Kilimanjaro: Day 5 - Rongai Route

Copyright © 2001 - 2007 Andrew Leaney. All rights reserved.